The design life of the underground spent resin storage tanks has expired, requiring prompt removal of the waste for safe dry storage.
Timeframe: Timeframe: 2017/2018
This turnkey project consisted of providing systems and all services and operation staff related to performing recovery and packaging of the spent resin waste from two underground horizontal cylindrical storage tanks, through a restrictive 10” access pipe, into 5 m³ High Integrity Containers (HIC) within appropriate certified transportation shielded casks, for processing and dry storage. The scope includes approximately 55 cubic metres of resins and 20 cubic metres of water.