The design life of the underground spent resin storage tanks has expired, requiring prompt removal of the waste for safe dry storage.
Timeframe: 2016/2018
This turnkey project consisted of providing all services and operation staff related to sampling and characterization, recovery, packaging into drums, and shipment of the Moderator Purification System (MPS) spent resin waste stored in an underground horizontal cylindrical storage tank, and Heat Transport Purification System (HTPS) powdered resin waste stored in four underground rectangular concrete storage vaults, as well as associated mixed water, sand, and gravel waste for interim storage. The scope includes approximately 160 cubic metres of waste.