As the power plant is nearing its planned safe dry storage state, full emptying of the spent fuel and auxiliary pools is required.
Timeframe: 2019/2020
As the power plant is nearing its planned safe dry storage state, full emptying of the spent fuel and auxiliary pools is required.
Timeframe: 2019/2020